Installation site of production line for Ghanaian customer-200ML-2l Water filling line-Zhangjiagang Comark Machinery Co., Ltd.

Receba um orçamento gratuito

Nosso representante entrará em contato com você em breve.
E-mail
Telefone / Whatsapp
Mensagem
0/1000
Nome
Nome da empresa

Congratulations to our Ghanaian customer for successfully receiving all the machines!! And after a month and a half of installation training by our professional engineers, the production line was successfully connected and started running. The video shows the factory director and our engineers. The factory director is very satisfied with our equipment and we has received continuous positive feedback!

Anterior

nenhum

Todas as soluções Next

nenhum

Entre em contato

Pesquisa relacionada

email ir para o topo