Installation site of production line for Ghanaian customer-200ML-2l Water filling line-Zhangjiagang Comark Machinery Co., Ltd.

Ottieni un preventivo gratuito

Il nostro rappresentante ti contatterà al più presto.
Email
Telefono / Whatsapp
Messaggio
0/1000
Nome
Nome azienda

Congratulations to our Ghanaian customer for successfully receiving all the machines!! And after a month and a half of installation training by our professional engineers, the production line was successfully connected and started running. The video shows the factory director and our engineers. The factory director is very satisfied with our equipment and we has received continuous positive feedback!

Precedente

Nessuna

Tutte le soluzioni Avanti

Nessuna

Contatti

Cerca Related

email goToTop