Installation site of production line for Ghanaian customer-200ML-2l Water filling line-Zhangjiagang Comark Machinery Co., Ltd.

Obtenir un soumission

Notre représentant vous contactera bientôt.
Email
Téléphone / Whatsapp
Message
0/1000
Nom
Nom d'entreprise

Congratulations to our Ghanaian customer for successfully receiving all the machines!! And after a month and a half of installation training by our professional engineers, the production line was successfully connected and started running. The video shows the factory director and our engineers. The factory director is very satisfied with our equipment and we has received continuous positive feedback!

Précédent

Aucune

Toutes les solutions Suivant

Aucune

Contactez-Nous

Recherche apparentée

email aller au haut